Overall OEE
Calculating
0.0%
Lean Benchmark:
≥ 85.0%
Availability (A)
--
0.0%
Run: 0m
Stops: 0m
Performance (P)
--
0.0%
Speed Loss:
0 min
Quality (Q)
--
0.0%
Good: 0
Scrap: 0.0%
Shift Production Parameters
Live Sync
Total duration of rotation
Tea, lunch, 5S sweep
Scheduled shift quota
Gross parts through line
Rejected or reworked units
Required Takt Time
21.8 sec
Actual Mean Cycle
23.6 sec
⚠ UK HSE & 5S Incident Tagging
Zero safety near-misses or RIDDOR triggers recorded this shift.
6 Big Losses: Stoppage Log
Captures downtime events and feeds the 80/20 Pareto chart
Logged Unplanned Downtime:
0 Minutes
Pareto Loss Distribution (80/20 Rule)
Downtime Minutes vs. Cumulative %
Daily Gemba Kaizen & Countermeasures (PDCA)
Lock the permanent fix before handing the shift over
5-WHYS
Root Cause Drilldown (Ishikawa / Gemba Method)
Drill down until you hit the system/process defect
Why 1:
Why 2:
Why 3:
Why 4:
Why 5: